Utilities
Campulung INdustrial Park
 
UTILITIES

Electrical power : supply is ensured by CEZ Electrica network by means of its own transformer and 2 separate overhead lines of 110 KV and an overhead line of 20 KV. The installed power is of maximum 32 MW/h.


Sewerage: there is both a household and a pluvial sewerage network.

Water: 2 systems with a total flow of maximum 800 mc/h connected to the town supply. .


Gas: 2 systems with a total flow of maximum 2400 mc/h connected to GDF SUEZ distribution network.


Telephony/ Internet : services ensured by the existing supply networks in the area.

 

2009 © Copyright Landmark Management. Politici.